Build3
Title: Level 2 High Power Rocket Build
Location: H³ Workshop 1
Date: Spring 2013
Description: LOC “Big Nuke” PK-82 H³R2
Builder: Russell Hall
Project Mission Codename: H³R2(Rocket 2)
With a Cesaroni Pro54 2G J280 Smokey Sam should get this rocket to 2900ft at 394mph.
But a Pro 54 6G K1440WT would get it to 5900ft at Mach 1.31
Building should start in the late winter, early spring ~ March 2013
Launch Date May 4, 2013
Launch Location at S.M.A.S.H. in Muskegon, MI
un boxed on Christmas day 2012
Starting Build March 10, 2103 – Motor tube lined up.
Three Fins installed, now time for fillets 🙂
March 13, 2013 all of the fillets inside and outside, took one day to do a side.
March 16, 2013 developed a tracking bay for my ham beacon
54mm tube mounted to the front ring
Rear ring install on to the tracker tube.
March 17, 2013 – Tracker Tube installed into the coupler
Side view of tracker bay
Epoxy in the back of the ring in the coupler
Tracker on shed to go into the tracker bay tube.
Got the rear ring on, and the Aero Pack motor retainer jb welded on.
March 20, 2013 nosecone mounted to the payload bay.
March 23, 2103 yellow primer on.
May 3, 2013 – Here is what it looks like with all of the paint and decals done..
First flight May 4, 2013 at SMASH
Published @ November 15, 2012 8:01 pm